Concrete Wall Construction (Tilt-Up Buildings)
Concrete walls for new building at Flynn Rd. Business Park.
To construct a tilt-up building, we frame and pour the walls on the floor and then raise
into place with a crane.
Bracing the concrete walls.
Getting ready to pour concrete walls (the frame is built on the casting slab).
Walls in place.
Hoisting a wall for a loading dock.
Concrete boom pump pouring walls.
Walls poured.